×

built pile meaning in Chinese

组合桩

Examples

  1. Technical specification for building pile foundations
    建筑桩基技术规程
  2. The factors that cause negative friction are discussed . the mechanism of negative friction and the methods decreasing it are also studied . the neutral point and negative friction are determined according technical code for building pile foundation
    对单桩负摩阻力的产生原因、产生机理、减少负摩阻力的方法、建筑桩基规范中负摩阻力的确定方法、负摩阻力中性点位置的确定、以及对荷载传递基本微分方程的推导都进行了论述。
  3. In order to reveal load mechanism and failure mode of thick pile caps , by means of the test of 1 / 4 - scale models of thick pile caps with six piles and post - handling study of 3 - dimensional non - linear finite element adina , this paper points out the shortage , which is that the design of pile caps is carried out by flexural strength in chinese technical code for building pile foundations jgj94 - 94 and american reinforcement concrete building construction code aci318 - 02 , promulgates that the failure mode of thick pile caps is punching failure and load transfer mechanism is the strut - and - tie , which is that zones of concrete with primarily unidirectional compressive stresses are modeled by compress struts , while tension ties are used to model longitudinal reinforcement over pile
    摘要为揭示厚承台的传力机理和破坏形式,通过对4个1 : 5比例的六桩厚承台的模型试验研究与三维非线性有限元adina的后处理研究,指出中国建筑桩基技术规范jgj94 - 94与美国钢筋砼房屋建筑规范aci318 - 02规范中,承台以弯曲强度进行配筋计算的设计方法之不足,揭示出厚承台的破坏模式是冲切破坏,传力机理是以带有主要单向压应力的砼区域作斜压杆,桩顶区域的纵筋作拉杆的空间桁架。
  4. Secondly , this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example , this paper carried out scheme design for this technology , and compared some different kinds of underpinning scheme and node and structure design , and put forward the method of " reinforcce steel bar through column " to build pile cap beam , " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect , and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam , etc . in the process of the consturction scheme research and implement , this paper synthetically elaborated the organizaton for project construction , put forward the construction technical measure of specific aim on the artificial pile , and pile cap beam , and underground adding layer and structure stabilization , and overall structure stabilization and so on . for this project , adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction , use flexible connection catch to make the cage hoisting easier to simplify the construction process , use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation
    本文首先对于基础托换与结构加固技术的目的和意义、国内外发展状况进行了综合阐述;其次对该项技术工程分类及适应范围进行了理论上的分析研究;然后结合工程实例对该项技术进行了方案设计,对比几种不同的托换方案和节点及构造设计,提出了“通筋穿柱法”做承台梁, “抗弯抗剪锚筋法”强化柱加固效果, “钢板箍法”做地基梁钢筋连接点等多项技术;在施工方案的研究和实施过程中,对于工程施工组织进行综合阐述,并就人工挖孔桩、承台梁、地下加层及结构加固、整体结构稳定等专项施工方案提出有针对性的施工技术措施,人工挖孔桩施工采用钢筋砼护壁确保挖孔桩的安全成型,使用柔性连接钩进行钢筋笼吊装简化施工工序;承台梁施工采用梁主筋横穿柱身化学胶锚固等;地下加层综合施工技术采用土方分层对称平衡开挖,分段挖土做筏基结构自稳等;最后对于该工程实施后的效果分析,说明该项综合施工技术的可行性。

Related Words

  1. piling
  2. carbon pile
  3. granular pile
  4. pile area
  5. polypropylene pile
  6. battered pile
  7. bored piling
  8. spliced pile
  9. lag pile
  10. pressure pile
  11. built on the sand
  12. built or made as the buyer specifies
  13. built pillar
  14. built platform
PC Version

Copyright © 2018 WordTech Co.